📍 Jatlan Head, Mirpur AJK  ·  0300 5140524  ·  05827 403026  ·  info@katariaengineering.com اردو · Today: Material prices
Kataria Engineering

Civil Engineering Formula Sheet

Key formulas for RCC, steel, soil mechanics, hydraulics, surveying, highways and estimation — with links to free calculators.

Concrete & RCC (ACI 318)

TopicFormula
Modulus of elasticityEc = 4700√f′c (MPa)
Modulus of rupturefr = 0.62λ√f′c
Stress blocka = As·fy / (0.85·f′c·b); β1 = 0.85 for f′c ≤ 28 MPa
FlexureφMn = φ·As·fy·(d − a/2), φ = 0.9 (tension-controlled)
Minimum steel (beams)As,min = max(0.25√f′c/fy, 1.4/fy)·b·d
Shrinkage steel (slabs)0.0018·b·h (Grade 60)
Concrete shearVc = 0.17λ√f′c·b·d
Stirrupss = Av·fy·d / Vs; s ≤ d/2 (≤ d/4 if Vs > 0.33√f′c·bd)
Columns (tied)φPn,max = 0.80·φ·[0.85f′c(Ag − Ast) + fy·Ast], φ = 0.65
Deflection (simply supported UDL)δ = 5wL⁴ / (384EI)

Steel (AISC 360)

TopicFormula
Plastic momentφMn = 0.9·Fy·Zx (compact, braced)
Euler stressFe = π²E / (KL/r)²
Column (inelastic)Fcr = 0.658^(Fy/Fe)·Fy when KL/r ≤ 4.71√(E/Fy)
Column (elastic)Fcr = 0.877·Fe
Bolt shearφRn = 0.75·Fnv·Ab per shear plane
Bolt bearingφRn = 0.75·2.4·d·t·Fu

Soil mechanics

TopicFormula
Moisture contentw = Ww/Ws × 100
Void ratio & porositye = Vv/Vs; n = e/(1 + e)
Dry densityγd = γ/(1 + w)
SaturationS·e = w·Gs
Zero air voidsγd = Gs·γw / (1 + w·Gs)
Plasticity indexPI = LL − PL; A-line PI = 0.73(LL − 20)
Shear strengthτ = c + σ′·tanφ
RankineKa = (1 − sinφ)/(1 + sinφ) = tan²(45 − φ/2)
Consolidation settlementS = Cc·H/(1 + e0)·log[(σ′0 + Δσ)/σ′0]
Terzaghi/Meyerhofqu = cNc + qNq + ½γBNγ (with shape & depth factors)
Darcyv = k·i; Q = k·i·A

Hydraulics

TopicFormula
ContinuityQ = A·V
Bernoulliz + p/γ + V²/2g = constant (+ losses)
ManningV = (1/n)·R^⅔·S^½ (SI)
Darcy–Weisbachhf = f·(L/D)·V²/2g
Hazen–Williamshf = 10.67·L·Q^1.852 / (C^1.852·D^4.87)
Froude numberFr = V/√(g·D_h)
Rational methodQ = C·i·A/360 (m³/s, mm/h, ha)

Surveying

TopicFormula
Rise & fall checkΣBS − ΣFS = ΣRise − ΣFall = Last RL − First RL
Latitude / departureL·cosθ / L·sinθ
Bowditch correctione × (line length / perimeter)
CurveT = R·tan(Δ/2); L = πRΔ/180; δ (min) = 1718.87·c/R
TacheometryD = K·s·cos²θ + C·cosθ
Curvature & refractionc = 0.0673·d² (m, d in km)

Highways & traffic

TopicFormula
Stopping sight distanceSSD = 0.278Vt + V²/[254(a/9.81 ± G)]
Minimum radiusR = V²/[127(e + f)]
Greenshieldsq = vf·k·(1 − k/kj); qmax = vf·kj/4
Webster cycleCo = (1.5L + 5)/(1 − Y)
CBR thicknesst = √[P(1/(8.1CBR) − 1/(pπ))] (in, lb, psi)

Estimation (Pakistani practice)

TopicFormula
Dry volume of concretewet volume × 1.54
Dry volume of mortarwet volume × 1.33
Cement bag50 kg = 1.25 cft (0.0347 m³)
Bricks13.5 bricks per cft of 9″ masonry (9″×4½″×3″)
Steel weightd²/162.2 kg/m (d in mm)
Land1 marla = 272.25 sq ft (225 in many societies); 1 kanal = 20 marla; 1 acre = 8 kanal

Calculators

Every formula above has a free calculator in our engineering tools.

Need an engineer for a real project?

Design, testing, supervision and construction across AJK & Punjab.