Silt Content of Sand (Field Test) — Lab Manual
Silt Content of Sand (Field Test): objective, apparatus, step-by-step procedure, formulas, typical values and a printable data sheet (field settling test, IS 2386-II method).
Objective & standard
Quick site check of clay and silt in sand before using it in concrete or plaster.
Standard: field settling test, IS 2386-II method
Apparatus
- 250 ml glass measuring cylinder
- 1 % salt solution
- Ruler
Procedure
- Pour 50 ml salt water into the cylinder.
- Add sand up to the 100 ml mark, then water to 150 ml.
- Shake well and leave for 3 hours.
- Measure the silt layer (V1) and the sand layer below it (V2).
Calculations
- Silt (%) = V1 ÷ V2 × 100
Typical values: Up to 6–8 % acceptable for concrete; above 8 % wash the sand or reject it.
Data sheet (print this page)
Project: ____________________ Sample: __________ Date: __________ Tested by: __________
| Sample / source | V1 (ml) | V2 (ml) | Silt (%) |
|---|---|---|---|
Want hands-on lab experience?
Do these tests with our lab team during an internship, or book a guided lab visit for your class.
