Earned Value (Progress)
Track project progress and cost: PV, EV, AC, SPI, CPI and estimate at completion.
Loading the calculator… (JavaScript is needed)
About this test
Enter budget, planned and actual progress and cost.
How it's calculated
- SPI = EV/PV, CPI = EV/AC, EAC = BAC/CPI
Results are calculated from the values you enter using standard formulas. Download the PDF to keep a record. For certified testing, design or construction, talk to our engineers.