Earned Value (Progress)

Track project progress and cost: PV, EV, AC, SPI, CPI and estimate at completion.

Loading the calculator… (JavaScript is needed)

About this test

Enter budget, planned and actual progress and cost.

How it's calculated

  • SPI = EV/PV, CPI = EV/AC, EAC = BAC/CPI

Results are calculated from the values you enter using standard formulas. Download the PDF to keep a record. For certified testing, design or construction, talk to our engineers.

Cite this tool

Kataria Engineering & Consultancy Services (2026). Earned Value (Progress) [online calculator]. https://katariaengineering.com/tools/earned-value-calculator.html