When you ask a contractor for a price, the first question is usually: grey structure or complete? Here is what the two mean and how to choose.

What "grey structure" includes

Grey structure is the building's skeleton and shell:

  • Excavation, foundations and plinth
  • RCC columns, beams, slabs and staircase
  • Brickwork for all walls, and plaster
  • Kacha flooring (the base under the final floor)
  • Electrical conduits and concealed plumbing pipes in walls and slabs
  • All labour for the above

At this stage the house has walls and roofs, but no tiles, paint, doors, windows, wiring or fittings.

What "complete" adds

Complete or turnkey construction adds all the finishing work:

  • Floor and wall tiles or marble
  • Paint and polish
  • Wooden doors and hardware, windows and glass
  • Electrical wiring, switches and lights
  • Plumbing, water tanks and sanitary fittings
  • Kitchen and wardrobes

Which is right for you?

Choose grey structure if you want to buy finishing items yourself, have a trusted finishing team, or want to spread the cost over time.

Choose complete construction if you live abroad or are busy, want one party responsible for everything, and want a single warranty and a fixed handover date.

The cost difference

At our current rates, a standard grey structure costs roughly Rs 3,200–3,500 per sq ft and a standard complete house roughly Rs 5,700–6,000 per sq ft. Premium and luxury finishes add more. Check today's figures in the cost calculator.

A common mistake

Splitting the work between two contractors without clear drawings often leads to arguments about who is responsible — for example, conduits in the wrong place or uneven plaster that the tile fixer blames on the grey contractor. If you split the work, make sure the electrical and plumbing drawings are fixed before the grey structure starts.

Whichever you choose, our engineers supervise every stage. Ask us for a quotation on WhatsApp.

Planning to build?

Get a free consultation, or estimate your cost with our Detailed BOQ Estimator.

WhatsApp our engineer