📍 Jatlan Head, Mirpur AJK  ·  0300 5140524  ·  05827 403026  ·  info@katariaengineering.com اردو · Today: Material prices
Kataria Engineering

Grey Structure vs Complete House Construction

What is included in grey structure construction, what finishing adds, and which contract is better for you.

Grey structure

Excavation, foundation, RCC columns, beams and slabs, brick walls, plaster, electrical and plumbing pipes inside the walls, and the floor base. The house stands but has no tiles, doors, windows, fittings, kitchen or paint.

Complete (finishing) construction

Everything in grey structure plus tiles or marble, doors and windows, wiring and switches, sanitary fittings, kitchen, wardrobes, ceilings and paint — ready to live in.

Cost

Grey structure is usually about 55% of a complete house; finishing is the other 45% and varies most with your choices. See this month's figures on Construction Cost in Mirpur.

Which should I choose?

Grey structure only suits owners who can buy and supervise finishing themselves. A complete contract with one company gives one responsibility, a fixed price and one timeline.

General guidance from Kataria Engineering. Rules and prices change — ask us for advice on your own project.

Planning to build? Let's talk.

Free consultation. Call, WhatsApp or send your plot details.