Typical times
- 5 marla double storey: about 7–9 months complete
- 10 marla double storey: about 10–12 months complete
- 1 kanal: about 12–15 months complete
- Grey structure alone: roughly half of these
Stage by stage
Foundation 3–4 weeks; each floor's frame and roof slab 4–5 weeks including curing; brickwork 2–3 weeks per floor; plaster and services 5–6 weeks; finishing 3–4 months. Try our construction time planner.
What causes delays
Late payments, design changes after work starts, materials not on site, approvals, monsoon rain and labour shortages around Eid. A clear design, a payment plan and a written schedule prevent most of them.