Concrete Cube Register & Acceptance
Record cube crushing loads, get 7 and 28-day strengths, test due dates and acceptance of the concrete grade — with a PDF register.
Loading the calculator… (JavaScript is needed)
About this tool
Enter the grade, casting date and crushing loads of each cube. The tool converts load to strength, shows due dates and checks acceptance.
How it's calculated
- Strength = load ÷ cube area (150 mm cube = 22,500 mm²)
- Mean of the group ≥ fck + 0.825 × s (or fck + 4 MPa)
- Each result ≥ fck − 4 MPa (IS 456 Table 11)
What strength should concrete have at 7 days?
OPC concrete usually reaches 65–70% of its 28-day strength at 7 days.
Results are calculated from the values you enter using standard formulas. Download the PDF to keep a record. Contractors, architects and designers can print reports with their own logo with Kataria Pro. For certified design or construction, talk to our engineers.
Kataria Engineering & Consultancy Services (2026). Concrete Cube Register & Acceptance [online calculator]. https://katariaengineering.com/tools/concrete-cube-register.html
Want an exact figure for your house?
Our engineer visits your plot and gives you a written, fixed quotation.
