📍 Jatlan Head, Mirpur AJK  ·  0300 5140524  ·  05827 403026  ·  info@katariaengineering.com Sign in / Sign up · اردو · Today: Material prices
Kataria Engineering

Daily Labour & Productivity Log

Daily labour register: workers by trade, wages, output and productivity per worker-day, with labour cost per unit of work.

Loading the calculator… (JavaScript is needed)

About this tool

Fill in each trade, the number of workers, wage and output. You get today's labour cost and how productive each trade was.

How it's calculated

  • Cost = workers × daily wage × hours ÷ 8
  • Productivity = output ÷ worker-days
  • Labour cost per unit = cost ÷ output

How much brickwork does a mason lay per day?

About 80–100 cft of 9″ brickwork with two labourers.

Results are calculated from the values you enter using standard formulas. Download the PDF to keep a record. Contractors, architects and designers can print reports with their own logo with Kataria Pro. For certified design or construction, talk to our engineers.

Cite this tool

Kataria Engineering & Consultancy Services (2026). Daily Labour & Productivity Log [online calculator]. https://katariaengineering.com/tools/daily-labour-log.html

Want an exact figure for your house?

Our engineer visits your plot and gives you a written, fixed quotation.