Weather & Delay Log (Extension of Time)

Record delays by cause, total days lost and extension of time to claim — plus hot and cold weather concreting advice.

Loading the calculator… (JavaScript is needed)

About this tool

Log each delay with hours lost and who caused it (client, contractor or neutral).

How it's calculated

  • Days = hours lost ÷ working hours
  • Client + neutral delays give extension of time
  • Hot / cold concreting limits from ACI 305 / 306

Do rain delays give extra time?

Usually yes — exceptionally adverse weather is a neutral event that gives time but not money under most contracts.

Results are calculated from the values you enter using standard formulas. Download the PDF to keep a record. Contractors, architects and designers can print reports with their own logo with Kataria Pro. For certified design or construction, talk to our engineers.

Cite this tool

Kataria Engineering & Consultancy Services (2026). Weather & Delay Log (Extension of Time) [online calculator]. https://katariaengineering.com/tools/weather-delay-log.html

Want an exact figure for your house?

Our engineer visits your plot and gives you a written, fixed quotation.