Daily Progress & Days to Finish

Track brickwork, plaster, tiles, paint, RCC or steel progress: % complete, days left, expected finish and productivity vs norms.

Loading the calculator… (JavaScript is needed)

About this tool

Enter the total quantity, work done and today's output with the gang size.

How it's calculated

  • % complete = done ÷ total
  • Days left = remaining ÷ today's output
  • Productivity compared with typical norms

How much plaster can a mason do per day?

About 100–120 sq ft of ½″ plaster.

Results are calculated from the values you enter using standard formulas. Download the PDF to keep a record. Contractors, architects and designers can print reports with their own logo with Kataria Pro. For certified design or construction, talk to our engineers.

Cite this tool

Kataria Engineering & Consultancy Services (2026). Daily Progress & Days to Finish [online calculator]. https://katariaengineering.com/tools/daily-progress-calculator.html

Want an exact figure for your house?

Our engineer visits your plot and gives you a written, fixed quotation.