Pour-Day Concrete Checklist
Pre-pour inspection: formwork, steel, cover, inserts, materials, plant, cube moulds, plus slump, temperature and cover checks.
Loading the calculator… (JavaScript is needed)
About this tool
Tick the inspection items and enter slump, concrete temperature and cover to approve the pour.
How it's calculated
- Inspection items from ACI 301 practice
- Slump per ASTM C143 within the specified range
- Concrete temperature ≤ 35 °C
What slump is right for a slab?
Usually 75–100 mm for hand-placed slabs; follow your specification.
Results are calculated from the values you enter using standard formulas. Download the PDF to keep a record. Contractors, architects and designers can print reports with their own logo with Kataria Pro. For certified design or construction, talk to our engineers.
Kataria Engineering & Consultancy Services (2026). Pour-Day Concrete Checklist [online calculator]. https://katariaengineering.com/tools/pre-pour-concrete-checklist.html
Want an exact figure for your house?
Our engineer visits your plot and gives you a written, fixed quotation.
